| Project Cost Estimates (Phase 2 ) | |
|---|---|
|
Masjid
|
$900,000.00
|
|
Masjid Lobby
|
$250,000.00
|
|
East Wing
|
$1,650,000.00
|
|
First School Building
|
$600,000.00
|
|
Basketball Court, Playground, Picnic Shelter, Canopies, and Landscape
|
$180,000.00
|
The above numbers are projected costs based on our best study at the time. Cost estimates are subject to change based on the design and number of people needed.